Within the scope of the project carried out by STARGAZ, the manufacturing and installation works of the 2-kilometer-long 10’’ jetty line were successfully completed. During the project, piping infrastructure, connection equipment and line systems were implemented in accordance with modern engineering standards.
The works, carried out with the goals of system safety, durability and long-lasting operation, were meticulously completed by our expert teams, contributing to the efficient continuation of port operations. STARGAZ continues to provide reliable engineering solutions in industrial piping and process line projects.